Electric 20 Ton Overhead Traveling Crane , Double Beam Bridge Crane
Product Details:
Place of Origin: | Henan, China (Mainland) |
Brand Name: | WEI HUA |
Certification: | CE/ISO/GOST/SGS/BV/TUV |
Model Number: | LH |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Set/Sets |
---|---|
Price: | Negotiable |
Packaging Details: | Wooden packing |
Delivery Time: | 10-30 work days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 20000 Set/Sets per Year |
Detail Information |
|||
Rated Loading Capacity: | 1-20t | Max. Lifting Load: | 32t |
---|---|---|---|
Max. Lifting Height: | 25m | Span: | 10.5m-31.5m |
Working Duty: | A5, A6, A7 | Hoisting Mechanism: | Electric Hoist |
High Light: | double girder bridge crane,double girder eot crane |
Product Description
EOT double girder overhead crane
Overhead crane also called bridge crane or electric overhead travelling crane(EOT Crane).Usually used in the workshop ,warehouse and yard over the material lifting hoisting equipment to lift some material.It can be classificated: double girder and single girder overhead crane.According to its function also can be classficated:Grab bucket overhead crane,Electronic magnetic overhead crane,Suspend type overhead crane,Casting overhead crane.
Application
Industry of machinery production, assembling, petrochemicals, warehouse logistics, electric power construction, papermaking and railways.
SPECIFICATIONS FOR 50 TON EOT DOUBLE GIRDER OVERHEAD CRANE(Could be customised) |
|||
Crane main datas |
Safe working load |
ton |
50 |
Lifting height |
m |
6-30 |
|
Span |
m |
6-32 |
|
Speed |
Main/Aux. lifting |
m/min |
0.4~4/0.49~4.9 |
Cross travelling speed |
m/min |
2.9~29 |
|
Long travelling |
m/min |
5.4~54/4.8~48 |
|
Crane supply system |
Max. wheel load |
KN |
150-202 |
Total power |
kw |
71 |
|
Crane rail recommended |
-- |
QU80 |
Main advantage & feature of Overhead Traveling Crane
1. High quality thanks to proven crane components
2. Particularly high performance thanks to the double-girder design which enables high
3. long and cross-travel speeds to be achieved
4. Low deadweight reduces investment layout
5. Possible fittings: Optional maintenance platform for maintenance of your building
6. fittings and operation of the crane by means of cabin or radio control Technical