Steel Hydraulic Rotating Timber Grab For Ports / Railways Loading And Unloading
Product Details:
Place of Origin: | Henan, China (Mainland) |
Brand Name: | WEI HUA |
Certification: | CE/ISO/GOST/SGS/BV/TUV |
Model Number: | Timber Grab |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 Set/Sets |
---|---|
Price: | Negotiable |
Packaging Details: | usually standard export wooden pallet for Excavator Grapple. |
Delivery Time: | Shipped in 8 days after payment |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 20000 Set/Sets per Year |
Detail Information |
|||
Model Number: | Timber Grab | Application: | Scrap Steel,pig Iron, Stone Etc |
---|---|---|---|
Material: | Steel | Color: | Requirement |
Warranty: | 12 Months | Certification: | ISO9001:2008 |
Delivery: | Within 10 Days | ||
High Light: | excavator clamshell bucket,crane grab bucket |
Product Description
Excavator Clamshell Grab Bucket,Excavator Grab Bucket
Timber Grab
Product Description
Grab is a lifting appliance which depend on jaw opening and closing crawl and unloading bulk material.
According to be stacked capture material density is divided into light, medium, heavy, and super heavy.
Light | Coke, slag, Cereals, potatoes, lime, cement blocks in anthracite, dirt, gravel, clay, brick | 0.5--1.2 |
Medium | Peat, the bulk of anthracite, coal, limestone, clay compaction, gravel, salt, gravel, brick, alumina, iron sheet iron oxide, cement, water, sand etc. | >1.2--2.0 |
Heavy | Limestone, clay, a small piece of ore, hard rock, stick on shaped iron oxide, iron ore, lead ore concentrate | >2.0--2.6 |
Super Heavy | Lump ore, manganese ore, bulk deposition of ore powder caking | >2.6 |
Timeber Bucket is suitable for the ports, railways, forest farms,such as loading, unloading, can also be used in a row, crib pile etc.
Type | The Biggest Diameter Wood mm | Block and Tackle Multiple | Diameter of Wire Rope mm | With Transport Ton | The Pulley Diameter mm | Grab Weight t |
Mz3 | Φ300 | 3 | Φ13.5 | 3 | Φ250 | 1.3 |
Mz5 | Φ500 | 4 | Φ16 | 5 | Φ300 | 2.2 |
Mz5-1 | Φ600 | 4 | Φ17.5 | 5 | Φ350 | 2.4 |
Mz5-2 | Φ600 | 4 | Φ17.5 | 5 | Φ350 | 2.46 |
1. Delivery time:
within 15 ~30 business day after the receipt of deposit.
2. Packaging:
wood case for electric parts, accessories; large sections will be loaded onto bulk cargo ship after packing.
3. Transportation:
generally 35 days to 50 days to destination port.
4. Payment terms:
FOB, CFR and CIF are common trade terms.We can accept 30%T/T in advance,the balance paid before shipment.
5. Installation:
the installation team can be sent to local site to install for customer.