• 50 T Double Girder Overhead Travelling Cranes for Industrial workshop
50 T Double Girder Overhead Travelling Cranes for Industrial workshop

50 T Double Girder Overhead Travelling Cranes for Industrial workshop

Product Details:

Place of Origin: Henan, China (Mainland)
Brand Name: WEI HUA
Certification: CE/ISO/GOST/SGS/BV/TUV
Model Number: LH

Payment & Shipping Terms:

Minimum Order Quantity: 1 Set/Sets
Price: Negotiable
Packaging Details: Wooden packing
Delivery Time: 5-15 work days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20000 Set/Sets per Year
Get Best Price Contact Now

Detail Information

Rated Loading Capacity: 50t Rated Lifting Moment: Different
Max. Lifting Load: 50t Max. Lifting Height: 6m~30m
Span: 10.5-31.5m Hoisting Mechanism: Electric Hoist
High Light:

double beam bridge crane

,

double girder eot crane

Product Description

50 T Double Girder Overhead Travelling Cranes for Industrial workshop

 

Overhead cranes sometimes also called bridge cranes and eot crane, which are cranes with a hoist or winch traveling along the bridge beween parallel runways. They are designed to meet the medium to heavy industrial lifting requirements, covering all parts of the manufacturing process. Compared with single girder overhead crane, the double grider overhead crane can support biger lift capacity, and more suitable for heavy work duty.

 

Lifting Capacity

T

5

10

16/3.2

20/5

32/5

50/10

Span

m

10.5-31.5

Speed

Main Hook Lifting

A5

m/min

11.3

8.5

7.9

7.2

7.5

5.9

A6

15.6

13.3

13

12.3

9.5

7.8

Aux. Hook Lifting

 

 

 

16.7

19.5

19.5

10.4

Traveling of Crab

 

37.2

43.8

44.6

44.6

42.4

38.5

Traveling of Trolley

A5

89.8/91.8

90.7/91.9/84.7

84.7/87.6

84.7/87.6

87/74.2

74.6

A6

92.7/93.7

115.6/116/112.5

112.5/101.4

112.5/101.4

101.4/101.8

75/76.6

Operational Model

Cabin; remote control; ground handle

Working Duty

A5,A6

Power Supply

Three-phase A.C. 380V, 50Hz

 

Safety:

No.

Safety Measures

Foundation

1.

Loss of phase /voltageprotection

1. When the voltage/phase is too low, the electricity will disconnect

2.

Over Voltage, over current protection

1. When the voltage/phase is too big, the electricity will disconnect

3.

Overload Limit Switch

1. When the lift capacity is more than the max rated lift capacity, the electricity will disconnect, crane will stop work

4.

Weight limit

1. Supervise the decrease of hook. There is a limit height. The hook cannot fall any more if reach this limit

5.

Fire limit

1. Supervise the up and down limit position of Hook. Avoid the over increase and over decrease, protect hoist

6.

Crane Travel Limit Switch

1. Supervise the travel of crane, and stop crane travel more than rated travel distance. Keep Safe

 

50 T Double Girder Overhead Travelling Cranes for Industrial workshop 0

Want to Know more details about this product
I am interested in 50 T Double Girder Overhead Travelling Cranes for Industrial workshop could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.